Instant 1 Hour Crack and Floor Repair | Up To -20F

  • 2 gal set fills 462 cubic inches
  • VERY short working time
  • FAST SETTING CRACK REPAIR PRODUCT
(No reviews yet) Write a Review
SKU:
231682
$329.00

Product Details

FAST SETTING CRACK REPAIR PRODUCT. WILL CURE IN 15-20-MINUTES. OPEN TO FORKLIFT TRAFFIC IN 1 HOUR. CAN BE APPLIED DOWN TO 20 DEGREES F!

Amazing new product fixes cracks, repairs, spalls and small area concrete damage. Mix 1:1 and then immediately pour into area to be repaired. Aggregate such as sand should be used to give additional body and thickness. Color changes with addition of aggregate. This product is clear if used as a standalone filler. It will dry super hard, three times stronger than concrete.

Please note that this product has a VERY short working time, around 1-3 minutes when mixed with aggregate. Ensure to not mix Part A and Part B until ready to be applied. 2 gal set fills 462 cubic inches, or about 150 lineal feet of a 1/2″ wide by 1/2″ deep crack.

Cure Schedule

Pot Life (Working Time) – 1-3 Minutes

Recoat of Topcoat – 1 Hour

Light Foot Traffic – 15-20 Minutes

Full Cure (Heavy Traffic) – 1 Hour

*Dry times will vary based on application temperature. Application temperatures 20-90 degrees F.

Specifications

Dimensions

Details

Additional Info

Request a Quote, Request a Sample, Contact Support

We offer every client unlimited technical support and advice throughout the entire process of installing a new industrial floor coating, from the design phase all the way through installation. We are excited to help you create the industrial floor of your dreams!
Contact us today to explore the options available to you.

United States

International

Opening Times & Location

9 - 5 EST Monday - Friday